Fund Goal: K50,000

Funds Raised: K30,000

THE WATER SUPPLY PROJECT FOR THE PABARABUK STATION WAS SUCCESSFULLY DELIVERED. SPONSORS HAD CHIPPED IN FUNDS FOR THE PROJECT,HOWEVER IT WAS DELIVERED ON TIME. CURRENTLY, PAPBARABUK CAMPUS HAS FRESH WATER SUPPLY RUNNING FROM ALL TAPS INSTALLED INCLUDING STAFF HOUSES. THANKS TO THE PROJECT OFFICER, MR. LEVI AKO FOR A JOB WELL DONE. THE CHURCH HAS PLANS TO IMPROVE INFRASTRUCTURE DEVELOPMENT ON THE CAMPUS AND NEEDS SPONSORS TO DONATE TOWARDS THE PROJECTS.

SOME OF THE PROJECTS HIGHLIGHTED INCLUDES:

1. EXTENSION OF THE CAMPUS TABERNACLE. APPROXIMATELY 5 METRES IN LENGTH AND 2 METRES WIDE.

2. INSTALLATION OF A NEW STANDBY GENERATOR.

3. RENOVATION AND EXTENSION OF THE CAMPUS CHAPEL.

4. UPGRADING OF THE 5 KILOMETRES ROAD FROM THE MAIN HIGHWAY TO THE PABARABUK STATION.


IF YOU FEEL LED TO INVEST TOWARDS THE MENTIONED PROJECTS, PLEASE CONTACT US ON: 72031400. WITH THAT THANKS AND GOD BLESS!